Leakage measurement


The i2O system measures and reports minimum night flows on a daily basis. Based on these measured minimum night flows, leakage estimates by DMA can also be reported daily

Implementing Advanced Pressure Management will significantly alter the night-day factor NDF used to convert night leakage (in m3/hour) into average daily leakage, using the Average Zone Pressure (P4). The i2O system uses its pressure data to automatically calculate the new NDF after installation and at regular intervals.









Web design by Matrix e-Business and Notion Design